Moldova could receive gas through Trans-Balkan corridor as of January 1, 2020

Moldova as from January 1, 2020 will be ready to receive natural gas in a reverse flow regime through the Trans-Balkan corridor. The ȘDKRI (Shebelinka-Dnepropetrovsk-Krivoi Rog-Ismail) pipeline was reconstructed so as to allow receiving gas in reverse flow regime through the gas measuring station SM...

  • Acest conţinut este disponibil doar pe bază de abonament plătit.
    Vă rugăm să accesați compartimentul ABONARE

Вы используете модуль ADS Blocker .
IPN поддерживается от рекламы.
Поддержи свободную прессу!
Некоторые функции могут быть заблокированы, отключите модуль ADS Blocker .
Спасибо за понимание!
Команда IPN.