Blocks of municipal hosing sector ready for being connected to heat supply

The works to clean the engineering heating systems in the buildings of the housing sector of Chisinau have been fully completed. In the blocks managed by associations, the works were 90% completed. In such conditions, in general the heating system is ready for the cold season and only the signing of technical passports for the apartments managed by the associations is to be finished.

Contacted by IPN for a comment, deputy head of the Chisinau Public Amenities Division Gennady Dubița said all the heads of the municipal housing sector managing enterprises already signed the technical passports. The associations signed them in proportion of over 40%. In such conditions, the blocks managed by the specialized municipal enterprises can be immediately connected to the heating system.

Twelve apartment buildings, an education institution and two business entities have been connected to the centralized heating system so far.

As to the repair of roofs, Gennady Dubițas said the municipal housing sector managing enterprises by now repaired 24,000 square meters of roofs of the 27,000 planned. There are problems related to the shortage of funds and because the dwellers become engaged in these works to a small extent.

The associations of dwellers reported about 9,000 square meters of repaired roofs. They usually solve the problems independently, without informing the local public authorities.

Вы используете модуль ADS Blocker .
IPN поддерживается от рекламы.
Поддержи свободную прессу!
Некоторые функции могут быть заблокированы, отключите модуль ADS Blocker .
Спасибо за понимание!
Команда IPN.